From a pile of rocks to a lifestyle house
Chillo’s building story

Hi, I’m Chillo – site manager with fur. I was there from the first shovel to the golden lettering. Come along and I’ll show you how chill in came to life in Lofer.
- Sept 2025construction starts
- 1 cranein the lift shaft
- Dec 2025garage ceiling poured
- 4 Dec 2026opening
Before – after

-
May 2025
How it all began
An old house, a bit of meadow and a lot of potential – right in Lofer, facing the Loferer Steinberge. The plans were ready and excitement was huge. All that was missing was the digger.
Chillo says: „I picked the best spot for the terrace straight away.“ -
September – October 2025
Groundwork: Lofer has rocks. Lots of rocks.
As soon as the old house was gone, the ground showed what it was made of: poor subsoil and rocks of every size – from fist-sized to small car. The pit had to be secured with drilling and shotcrete, and the diggers had their buckets full for weeks.
Chillo says: „If you think a building pit is just a hole, you’ve never been to Lofer.“Swipe for more photos · tap to enlarge
-
October – November 2025
A crane in the lift shaft
Space on our plot is a luxury. So the crane went exactly where the lift runs today: right inside the lift shaft. The house grew around it floor by floor – precision work you don’t see every day. Then came the rebar and the base slab.
Chillo says: „I suggested simply using the crane as a lift later. Sadly, that was turned down.“Swipe for more photos · tap to enlarge
-
November – December 2025
Racing the winter
First snow, cold fingers, full focus: the builders poured the underground garage ceiling before Christmas. That laid the foundation for everything that followed – and the crew had truly earned their holidays.
Chillo says: „Best Christmas present ever: a finished garage ceiling.“Swipe for more photos · tap to enlarge
-
February – April 2026
Spring turbo
From February it was one step after another: walls, ceilings, floor after floor. Good weather, well-coordinated contractors and a site management that had everything under control made for a smooth and fast build. By the end of April the roof truss was up.
Chillo says: „Site manager’s tip: just order perfect weather. It worked.“Swipe for more photos · tap to enlarge
-
May – August 2026
Roof on, façade up
The roof was sealed, the façade got its wooden coat, windows and balconies followed. Now everyone on the street could see: something special is happening in Lofer.
Chillo says: „From then on I enjoyed applause from the pavement every day.“Swipe for more photos · tap to enlarge
-
June – September 2026
Getting cosy inside
Underfloor heating, cables, screed, wooden floors and bathrooms: inside, the craftsmen turned bare shell rooms into bright apartments with high ceilings under the roof – with lots of attention to detail.
Chillo says: „I checked every window sill for the view. Result: excellent.“Swipe for more photos · tap to enlarge
-
September – October 2026
Finale: asphalt, garden, golden letters
Garage asphalted, paths paved, garden planted – and then the best moment: the golden chill in lettering went up on the wall. From planning and site management to branding and marketing, everything went perfectly. On 4 December 2026 it’s: welcome to chill in!
Chillo says: „Site manager’s verdict: all good. Time to chill.“Swipe for more photos · tap to enlarge
Your turn now
The building site is history, the apartments are ready. Chillo is looking forward to meeting you.